Thursday, 26 November 2026
PLEN
Kraków-0°CSnow
Heavy snowfallLevel 1
26.11 18:00 – 27.11 18:00
Snowfall is forecast, causing snow cover to increase by 10 cm to 15 cm in places, locally up to 20 cm.
Heavy snowfallLevel 1
26.11 15:00 – 27.11 15:00
Snowfall is forecast, causing snow cover to increase by 10 cm to 15 cm in places, locally up to 20 cm.
Heavy snowfallLevel 1
26.11 21:00 – 27.11 15:00
Snowfall is forecast, with snow cover expected to increase by 10 cm to 15 cm.
Source: IMGW-PIB · Lesser Poland Voivodeship
Local news of Kraków and Lesser Poland

Elevator at Youth Centre on Krupnicza Street Now Operational

Culture & Events — Krakow
Culture & Events — Krakow · Ilustracja poglądowa | © Krakow.net.pl

The elevator at the Youth Centre (Centrum Młodzieży im. dr. Henryka Jordana) at ul. Krupnicza 38 in Kraków has been put into operation. As a result, the building is now accessible to people with disabilities. The entire project, which included building an external elevator shaft, cost 2 323 417,82 zł.

In brief

  • The elevator at the Youth Centre at ul. Krupnicza 38 in Kraków has been put into operation, and the building is now accessible to people with disabilities.
  • The investment included construction of an external elevator shaft, reconstruction of part of the external wall and roof, and works in the inner courtyard.
  • The value of the project was 2 323 417,82 zł.
  • Information about the elevator’s launch was published on November 26, 2026.

Building now accessible to people with disabilities

The elevator’s launch means that the Youth Centre building at ul. Krupnicza 38 is now accessible to people with disabilities. Other users of the facility can also use the elevator. The device makes it easier to reach individual floors of the historic building for program participants, staff and visitors.

The Youth Centre’s main headquarters is located at ul. Krupnicza 38, 31-123 Kraków. Information about the elevator’s launch was published on November 26, 2026.

Important: The elevator may be used by people with disabilities and other Youth Centre users, including program participants, staff and visitors to the facility at ul. Krupnicza 38.

Scope of the works

The investment covered several areas of work, which together prepared the building for the new elevator. The most important of these concerned the building’s structure and its surroundings.

The elevator entrances were created in the places of former window openings. The reconstruction of the inner courtyard, along with works on the circulation area and the storm water drainage system, was combined with work on the shaft itself to form a coherent project.

  • construction of an external elevator shaft,
  • reconstruction of parts of the external wall and roof,
  • creation of elevator entrances in the places of former window openings,
  • reconstruction of the inner courtyard,
  • works on the circulation area and the storm water drainage system.

Project value and funding

The project, titled “Extension with an external elevator shaft, together with reconstruction of parts of the external wall and roof of the Youth Centre named after Dr. Henryk Jordan in Kraków,” had a value of 2 323 417,82 zł.

Preparations for this investment began earlier. In 2023, 25 thousand zł was planned in the city budget for preparing the design documentation for an elevator for people with disabilities.

Youth Centre on Krupnicza Street

The Youth Centre named after Dr. Henryk Jordan is a municipal out-of-school education facility. It runs activities for children and young people and supports Kraków’s schools and parents in organizing free time.

Improving the building’s accessibility concerns program participants, staff and visitors alike. Thanks to the elevator, individual floors of the historic building have become accessible to a wider group of people.

Frequently asked questions

Who can use the elevator at the Youth Centre at ul. Krupnicza 38?

The elevator may be used by people with disabilities and other Youth Centre users. This includes program participants, as well as staff and visitors to the facility.

What did the elevator investment include?

The scope included construction of an external elevator shaft, reconstruction of parts of the external wall and roof, creation of elevator entrances in the places of former window openings, reconstruction of the inner courtyard, and works on the circulation area and the storm water drainage system.

How much did the project cost?

The value of the project “Extension with an external elevator shaft, together with reconstruction of parts of the external wall and roof of the Youth Centre named after Dr. Henryk Jordan in Kraków” was 2 323 417,82 zł.

Key facts

  • The elevator at the Youth Centre at ul. Krupnicza 38 is now operational, and the building is accessible to people with disabilities.
  • The investment, worth 2 323 417,82 zł, improves access to individual floors of the historic building for all users of the facility.

Based on information from: krakow.pl